Every acre of new roof and truck court in the South Platte valley has to leave the property slower than it arrived. Denver lies where Cherry Creek meets the South Platte River, Englewood sits in the same valley, and Clear Creek runs through Wheat Ridge on its way to the river. Industrial parcels near those waterways inherit their flood history, their outfall rules and their groundwater, which is why a Denver site and a high-ground site in Thornton can need very different drainage solutions.
We build the drainage systems that make a site approvable and keep it dry: detention and retention basins, outlet structures, storm sewer, inlets, manholes, swales, trench drains, water quality features and the grading that directs sheet flow away from buildings and docks. On an industrial site, where impervious cover can reach most of the parcel, that infrastructure is often the largest single piece of the civil package.
It is also where inspections are strictest, because the city or county wants proof that the as-built facility matches the approved volume.
Components of a Typical Drainage Package
Our scope generally includes the detention basin or underground chamber system, concrete or riprap outlet works, trickle channels, emergency spillways, reinforced concrete and HDPE storm pipe, inlets and manholes, forebays and sediment traps, and permanent water quality devices. Truck courts get their own drainage with trench drains at dock doors, valley gutters and catch basins sized for the pavement slope.
We also construct the erosion control measures that protect these facilities during building construction, and then convert temporary sediment basins to permanent facilities at the right moment, which requires cleaning, regrading and sometimes new outlet hardware.
Floodplain and Outfall Requirements
Floodplain rules vary by jurisdiction. Commerce City's local amendments reference a flood hazard map based on a FEMA study dated March 5, 2007, so finished floor elevations and detention outlets on parcels in or near mapped floodways are checked against that base data. Other cities and counties use their own criteria for allowable release rates, volume and water quality capture.
Before we construct, we confirm the approved drainage report and its design assumptions, the receiving system and any easements required for off-site outfalls. Irregularities, such as an undersized downstream pipe or an outfall that discharges across a neighbor's land, are raised with the engineer early so that the permit is not jeopardized by a field fix.
Building the Basin as an Engineered Structure
A detention basin is earthwork with a regulatory purpose, so tolerances matter. We survey the bottom elevation, side slopes and outlet invert at each stage and stake the basin from the engineer's volume table. Compaction of embankments is tested, outlet structures are set on stable bases with proper bedding and every pipe joint is inspected before backfill.
Underground detention, which is common on infill parcels in Englewood and Denver where land is expensive, adds precast or plastic chambers, stone bedding, inspection ports and load-rated cover. We install these on stable, level subgrades with strict control over cover depth during backfill, because heavy construction equipment can damage chambers that are loaded too early.
Managed Utility and Concrete Work
We schedule and inspect the trade partners who place storm pipe, set structures, pour concrete outlet boxes, headwalls and trickle channels, and finish the basin sides with seeding or armoring. Managing this as one scope tightens the schedule and gives us direct control over elevations, which are the most common source of failed drainage inspections.
The same trade partners build the adjoining pavement and curb, so that gutter flow lines meet inlets precisely, and we plan where snow storage areas must drain once plows start pushing piles to the edge of the yard. See our truck courts and trailer yards work for how pavement and drainage are integrated.
What Drives Drainage Cost
Drainage cost depends on the required detention volume, the depth and length of the storm sewer, the presence of groundwater and the need for off-site connections. Rock, utility conflicts and poor soils below basin floors raise price. Underground systems cost more per cubic foot of storage than open basins but free land for buildings and trucks.
We help owners evaluate these tradeoffs early. In some cases a combination of a smaller surface pond and a short run of underground chambers lets the owner add a dock position and still meet release-rate limits.
Hail, Snow and Cold-Weather Performance
Denver averages about 49 to 54 inches of snow per year and records some of the costliest hailstorms in the country, which means drainage must handle snowmelt and intense short-duration rain. Basins can fill with ice and snow, and outlet structures must be protected against freezing and debris. We specify trash racks, heavy-duty grates and accessible clean-out points so maintenance is practical.
Operators of food and beverage plants add washdown water and a stricter eye on what reaches the storm system, so we keep process drainage and stormwater separate and mark every connection. Long-term care matters too. We deliver maintenance manuals, show your facilities staff how to inspect outlets and sediment forebays and note the frequency of cleaning that the city expects.
Scheduling Drainage Within the Site Sequence
Drainage is usually among the first systems built after rough grade, because the pond serves as a sediment basin during construction and the storm sewer must be in place before paving. We time it ahead of site utilities trenching where invert elevations control the layout, and we stage it carefully against site clearing and mass grading to avoid rework.
Inspection hold points, such as pipe bedding, outlet structure forms and final basin volume, are scheduled in advance, because a missed inspection can delay backfill and everything behind it. Ice-free weather windows matter for outlet concrete.
Plan the Drainage First
Send us the drainage report or the site plan. We will price the system, test pond and chamber options and map the inspection sequence.
Common Questions
How big does a detention pond need to be?
The size comes from the approved drainage report, which depends on the impervious area, the soil type and the allowable release rate set by the city or county. Industrial sites with large roofs and paved yards often need a substantial portion of the parcel. We help owners test layouts so the pond fits without sacrificing truck circulation.
Can detention be placed underground?
Yes, where land value or site shape justifies it. Underground chambers or large pipe systems can free surface space for parking, trailers or building expansion, though they cost more and need access for inspection and cleanout.
What happens if the pond does not drain properly?
We check the outlet structure and invert elevations, verify that the pond bottom meets the design and examine downstream conditions. If the as-built differs from the approved plan, we work with the engineer to correct it and resubmit survey data to the city.
Who maintains the pond afterward?
Typically the property owner, according to the maintenance agreement attached to the approval. We provide an inspection checklist and train staff.
Do you build sites in a mapped floodplain?
Yes, with the necessary floodplain development permit and elevation certificates. Buildings generally have to be elevated or floodproofed, and fill in the floodplain may require compensatory storage.
Related
Related Services
Related Service Areas
Ready to talk about your project?
Request a Project Review
Talk to Our Project Team
Industrial Contractors of Denver
Project reviews for Denver, CO and nearby communities
Request a Review