Process equipment sets the structure of a manufacturing plant, and the building is drawn around it. A stamping press needs a deep, isolated foundation. A furnace or reactor needs a specific bay height and a path for replacement. A precision assembly line needs a floor that stays flat and a vibration level that does not drift. We read the equipment list before we talk about square footage, because the equipment list is where cost and schedule risk concentrate.
Metro Denver gives manufacturers a deep and varied employer base. Westminster's 2024 economic profile lists Ball Corporation (headquarters and manufacturing) with 1,335 employees, St. Anthony's North Hospital with 1,153, Maxar with 954 and Trimble with 850 as its top primary employers. Lockheed Martin began a $350 million, 266,000 square foot Gateway Center on its Waterton Canyon campus in Littleton in 2017, with about 1,500 construction contractors over a three-year build. Those two facts describe the market a new plant enters: a skilled workforce, established neighbors and a contractor labor pool that large projects already draw on.
We build new plants, expansions and production-line additions for operators in this metro. Our industrial renovation and modernization work covers the common case where an owner keeps producing while a new line goes in beside it.
Equipment loads, utilities and the path of the product
The first design decision is the flow: raw material in, product out, waste and utilities moving without crossing. We lay out receiving, production, packaging and shipping so forklifts, pedestrians and process piping occupy separate lanes. Where heavy equipment arrives in pieces, we reserve a knock-out panel, a crane pad or a temporary opening so the machine can be set after the roof is on.
Foundations deserve their own attention. Large presses, compressors and rotating equipment sit on isolated pads that do not share the floor slab, and the team we coordinate handles equipment pads and foundations as a separate pour, often early, with embeds and anchor bolts surveyed in before the concrete is placed. Utilities are the other long thread. Electric service, compressed air, process water, wastewater, natural gas and sometimes steam each arrive on their own timeline, and the building cannot start up until all of them do.
Codes, loads and the permit conversation
Design loads matter in a metro with real snow. Lakewood's city handout, for example, lists a 36 inch frost depth, a 30 psf non-reducible ground snow load, a 30 psf minimum roof snow or live load, wind Exposure C and Climate Zone 5. Those numbers are a reasonable reference for the metro and they shape footing depth, roof framing and the thermal envelope of a plant. We verify the figures for each specific jurisdiction before structural design is finalized.
Codes themselves differ across the metro. Westminster adopts the International Building Code, 2021 Edition, Chapters 2 through 35, and Colorado HB22-1362 requires any county or municipality updating its building code on or after July 1, 2023 to adopt an energy code at least as stringent as the 2021 IECC. For a plant, that means envelope, lighting and mechanical systems are designed to the energy code the city has adopted, and process loads are accounted for separately. We prepare the energy narrative early so the plan reviewer sees it with the first submission.
How we run a plant build
We build around the owner's operating plan. If the plant must begin production on a fixed date, we work backward from that date through commissioning, startup of utilities, equipment set and the building enclosure. Each hand-off between trades is shown on the schedule with the date it is needed, and we ask equipment vendors for certified drawings and delivery commitments before we commit to the structure.
Our field teams are organized by area, not by trade, so one superintendent owns the foundation, steel, slab and utilities for each bay and answers for how they fit together. Coordination drawings overlay structure, mechanical, electrical and process piping so clashes show up in the office. On projects that include industrial design-build delivery, the same team carries the work from concept through turnover.
Working safely around live operations
Manufacturing sites carry hazards that a speculative warehouse does not: energized process lines, chemical storage, hot work and moving equipment. We write a site-specific safety plan before mobilization, define the work zones against the owner's operating areas and require permits for hot work, confined space and lockout. Subcontractor orientation covers the owner's rules as well as ours.
Expansions of an operating plant add traffic and noise conflicts. We separate construction access from the plant's shipping routes, protect pedestrian paths and schedule noisy or disruptive work, such as core drilling near a laboratory or a cut into a live slab, in windows the owner approves. The goal is that production and construction share the property without either blocking the other.
A market with employers who build and rebuild
Broomfield's 2023 annual comprehensive financial report lists Oracle America (1,650 employees), Intermountain Health Care (1,550) and BAE Systems (1,100) as its three largest employers. Add Westminster's manufacturers and the Littleton aerospace campus and the metro looks less like a single industry than a set of specialty clusters: aerospace and defense, packaging, instruments and medical technology.
That variety shapes what we build. Aerospace and defense plants need controlled environments and secure site design. Packaging and consumer goods plants need long, flat floors and strong shipping docks. Electronics and medical device plants need clean power and vibration control. We tailor the building to the cluster, and our work for advanced manufacturing operators leans on that experience, as does our work for metals and heavy industry clients with very different loads.
Where plant budgets grow and how to hold them
Plant budgets grow in three predictable places: process utilities, structure sized for equipment not yet selected and late changes to the layout. We hold the first by asking utility and process engineers for load estimates in preconstruction, the second by carrying allowances in the structural design for known equipment families, and the third by setting a design freeze date with the owner.
Site cost also matters. Brownfield parcels in the metro, such as the industrial sites around Sheridan with legacy uses, can require environmental assessment and soil handling before any footing is dug. A site near an existing plant may allow shared utilities, which lowers the cost of the new food and beverage processing or light assembly building. Where the program is small, a flex light industrial shell can be a lower-risk way to start production.
Send the process flow and the equipment list
We will review the layout, flag the foundation and utility items that govern cost, and return a plan with a schedule. If the plant is part of a multi-site program, we can price the second location from the first.
Common Questions
Should we pick the equipment before the building is designed?
Ideally the major equipment is selected, or at least narrowed to two or three families, before structural design is final. Foundations, clear heights and utility capacity all depend on it. If the choice must wait, we carry allowances and design flexibility, and we tell you which choices are expensive to reverse.
How do snow loads affect a manufacturing roof in the Denver area?
City handouts in the metro list ground snow loads on the order of 30 psf and design roof loads accordingly, and rooftop equipment, drifting at parapets and heavy process exhaust add to the structural demand. We include mechanical unit weights and drift loads in the roof design, not as a late change.
Can a plant expand without stopping production?
Often yes. We phase the work, separate construction traffic, tie into utilities during planned shutdowns and keep existing fire protection in service. The detail is in the sequencing, and we write it with the plant manager before the contract is signed.
What is a realistic permit path for a new plant in Westminster or Littleton?
The city reviews site plan, building, fire and utility submittals, and Westminster adopts the 2021 International Building Code while Littleton lists the 2024 edition. We prepare submittals with the local amendments in mind and keep a running list of review comments so resubmittals are quick.
Do you coordinate with the equipment vendor?
We do. Vendors provide anchor bolt layouts, foundation requirements and utility connections, and we attend the coordination meetings. A plant built without early vendor input tends to need field modification of pits, embeds or openings.
Related
Related Services
Related Building Types
Related Industries
Ready to talk about your project?
Request a Project Review
Talk to Our Project Team
Industrial Contractors of Denver
Project reviews for Denver, CO and nearby communities
Request a Review