Added fermenting, aging and filtration capacity at a large brewery shows what process buildings ask of a contractor: floors that drain, structure that carries tanks, utilities that arrive on time and a schedule that does not stop production. We build that kind of work in Golden, along with research-adjacent labs, light manufacturing and service buildings, on sites where the land itself is limited.

Molson Coors broke ground in October 2020 on a multi-hundred-million-dollar overhaul of its Golden brewery, adding fermenting, aging and filtration capacity on a schedule running into 2024; the brewery has more than 800 employees. Projects of that scale show how much food and beverage production depends on constructible detail. They also tell suppliers, packaging houses and equipment installers that Golden is an active process-industry market, which is the market we serve.

We build foundations for tanks, trench drains and sloped floors, mechanical rooms, chemical-resistant slabs and the supporting warehouse and office space. We approach each job as a production system first and as a building second.

Constrained Land and Highway Access

Golden's land is tight. The NREL South Table Mountain site near Golden covers 327 acres, of which only 136 acres are available for development, 177 acres are protected by a conservation easement and 14 acres are restricted by utility easements. Parcels near Golden often work the same way: the acreage on paper can be larger than the buildable acreage, so a program has to fit inside what easements, slopes and setbacks allow, and the first design question is how much of the lot is truly usable.

Access is good if you plan for it. Interstate 70 runs through the southern part of Golden and connects to State Highway 470, U.S. 6 runs through the city toward Clear Creek Canyon, State Highway 58 is the Golden Freeway, and State Highway 93 continues north toward Boulder. We design truck routes and entrances with those roads in mind, and we confirm turning movements with the city and the state before the site plan is final.

Easements, Slopes and Tank Loads

Before we price a Golden project, we overlay easements, utility corridors, slopes and drainage paths on the survey to find the real building envelope. On sloping sites, we plan retaining walls, stepped pads and drainage swales early, since late changes in grade can push a building into an easement or leave a truck court at the wrong slope.

Process equipment adds its own demands. Fermentation and storage tanks weigh a great deal when full, so slabs and footings are designed for point loads and for the settlement limits that piping connections can tolerate. We coordinate with equipment vendors on anchor bolt layouts, embed plates and tolerances, and we pour housekeeping pads with the same care as the main slab. See our equipment pads and foundations page for more on how we handle those details.

Process Industries Around Golden

Food and drink producers need sanitary construction: sealed floors, cove bases, floor drains sized for washdown, wall systems that can be cleaned and ventilation that controls humidity. Our work for the food and beverage industry follows those rules and uses the details described under food and beverage processing buildings.

Golden also has a research and engineering community. The Colorado School of Mines in Golden has a 373 acre campus and enrolled 8,247 students in fall 2025, and the NREL South Table Mountain site shows the sort of laboratory and testing space that technical users need. For lab-adjacent light industrial users and prototype manufacturers, our advanced manufacturing experience covers clean power, vibration control and flexible utility service.

What We Build in Golden

We build new process and warehouse buildings, additions to existing plants, mechanical and utility rooms, loading docks, and the yards and parking that serve them. Interior work includes pits and trenches, sloped and drained floors, mezzanines and equipment platforms. Because the BNSF freight rail serves businesses in the northeast part of the city, we also look at rail-adjacent sites for bulk receiving and outbound product.

The RTD W Line light rail opened April 26, 2013 with a terminal station in Golden. For owners with employees who commute by rail or want transit access for a lab or office portion, we locate parking and pedestrian paths accordingly and coordinate with the city on frontage requirements. Producers that add refrigerated storage next to a process hall can talk to us early about the slab and insulation details that cold rooms need, and our work in nearby Lakewood and Broomfield follows similar practices. Whatever the program, we start from the process flow and let the structure follow it, because moving a tank or a conveyor after the slab is poured is the most expensive change on any food or drink project.

Code Cycle and Work Next to Live Production

The HBA of Metro Denver code tracker dated January 20, 2026 listed Golden as enforcing the 2024 IBC, 2024 IRC and 2024 IFC since August 2025, which means plans in Golden are reviewed to a recent edition and designers should expect current fire and accessibility requirements. We confirm the current set with the city before permit submittal and keep a record of every review comment.

Safety on an operating brewery or plant is about boundaries. We define work zones, use hot-work permits and lockout procedures when we connect to live systems, and keep chemicals, forklifts and pedestrians apart. Every crew on site attends your site orientation, follow your food-safety rules and keep materials covered so nothing falls into a product area.

Build the Process First

Bring us your process flow, your tank list or your lab layout. We will turn it into a buildable scope, a schedule and a budget.

Common Questions

How do we plan around easements on a Golden site?

We overlay all recorded easements, slopes and utility corridors on the survey before design starts. The NREL South Table Mountain summary shows how much of a large parcel can be unavailable: of 327 acres, only 136 are available for development. We use the same discipline on your lot to size the building to the buildable area, not the deed acreage.

Which code edition will Golden review my plans under?

The January 20, 2026 regional tracker listed Golden as enforcing the 2024 IBC, 2024 IRC and 2024 IFC since August 2025. We confirm with the city before permit submittal in case the adopted editions or amendments have changed.

Can you build tank pads and floor drains that stay watertight?

Yes. We design joints, waterstops, slopes and sealed surfaces for the washdown regime of your process, and we pour slabs with controlled curing to limit cracking. Drains and trenches are set and surveyed before the slab goes in, so connections to mechanical piping line up.

How do you avoid shutting down production during construction?

We separate the work zone, schedule tie-ins during planned outages, and keep deliveries off your product routes. A weekly look-ahead with your operations team sets the windows for noisy, dusty or utility-affecting work.

Is rail service practical for a Golden site?

BNSF freight rail serves businesses in the northeast part of the city, so rail access is possible there but not on most parcels. We check the physical room for a spur and the railroad process in the first weeks before you commit.

Related

Ready to talk about your project?

Request a Project Review

Talk to Our Project Team

Industrial Contractors of Denver

Project reviews for Denver, CO and nearby communities

Request a Review

ServicesBuilding TypesIndustriesService AreasAboutContactRequest a Project Review720-679-1387
Call Now720-679-1387