Some metro parcels carry a building on spread footings, and others need the load taken past whatever sits near the surface. We design, price and build deep foundations for industrial buildings and heavy equipment in the Denver metro: drilled piers, driven and helical piles, micropiles and grade beams, each chosen from the soil borings and the loads the structure will deliver.

The decision is rarely about the foundation alone. A crane-served plant, a tall cold-storage building or a tank farm each puts large concentrated loads on the ground, and settlement that would be invisible in a house will crack a slab, misalign a runway beam or bind a dock door. Deep foundations transfer those loads to bearing strata that do not move.

Owners often want one number for the foundation. We would rather give a range tied to the boring log and narrow it as the investigation progresses. We bring the foundation question into preconstruction, before the building is locked in, because the right answer sometimes changes the footprint, the column grid or even the site.

Ground Conditions Along the South Platte

Denver lies in the South Platte River valley, where Cherry Creek meets the river, and the surrounding industrial districts, including the north Denver industrial corridor, may sit on valley-floor deposits where groundwater can be shallow. Groundwater changes how holes are drilled, how excavations are dewatered and how concrete is placed, so we plan for it from the first boring log. Where a boring finds water within a few feet of the footing elevation, we ask the geotechnical engineer early whether permanent dewatering, a deeper element or a different foundation type is the safer bet.

Legacy industrial land adds another layer. Neighborhood activism in Globeville and Elyria-Swansea won a 1994 settlement with ASARCO that funded soil cleanup, a sign of legacy smelter contamination to check in due diligence near those areas. The Rocky Mountain Arsenal in Commerce City, now the Rocky Mountain Arsenal area, was built in 1942 on 17,000 acres, listed on the EPA Superfund National Priorities List in 1987 and cleaned up for $2.1 billion, with groundwater treatment continuing. Drilling spoils and dewatering discharge on or near such ground must be tested, managed and disposed of properly, and we price that into the work.

Choosing Between Piers, Piles and Micropiles

Drilled piers suit sites where competent bearing material is within reach of a drill rig and loads are large and concentrated. Driven piles suit sites with soft, deep soils and open access, although noise and vibration restrict their use near neighbors and occupied buildings. Helical piles install quickly with light equipment and work for lighter loads, retrofits and tight sites. Micropiles reach through obstructions and into rock in limited headroom.

Foundations for a manufacturing plant with bridge cranes, or for utilities and power structures with heavy cable and transformer loads, tend to lean on piers or piles for exactly these reasons. The choice depends on load size, soil profile, groundwater, access, noise limits, schedule and cost, and the geotechnical engineer recommends capacities. We price alternatives side by side. Occasionally the least expensive answer is ground improvement or overexcavation and replacement, and we say so when the numbers show it.

From Borings to Production Pile

We read the geotechnical report before bidding and talk to the geotechnical engineer about where the recommendations are conservative and where they are firm. For production work, we survey every location, verify pile or pier depth and bearing during installation, and keep logs with the geotechnical inspector. Load tests are scheduled early when the design calls for them so the results can adjust production, not arrive after it. If a test pier falls short, a longer or larger production element costs far less before the other 100 are drilled.

We coordinate the foundations with grade beams, pile caps and pier caps, and with the equipment pads and foundations that follow inside the building, and set anchor bolts, embeds and dowels to the structural tolerances. Spoils are stockpiled, sampled where required and hauled to an approved location. Utility conflicts and overhead obstructions are mapped before a rig moves onto the site.

Fitting Foundation Work Into the Critical Path

Deep foundations sit at the front of the schedule, and rigs are not always available on short notice. We reserve equipment during preconstruction, sequence production so cap and grade beam crews can follow close behind and plan so the steel or tilt-wall erection date is not held up by foundation delays. Rig mobilization overlaps with site clearing and mass grading, so we hand over rig platforms in the order the drilling sequence needs them.

Weather matters. Frozen ground complicates drilling, wet conditions create mud that prevents rig access and groundwater slows shaft work. We build a stabilized rig platform first and sequence holes so equipment keeps moving on firm ground instead of fighting the site.

Working Around Open Holes and Heavy Rigs

Open shafts, rotating augers and suspended reinforcement cages are hazards that need discipline. Holes are covered or barricaded the moment drilling stops, rigs work on engineered platforms, and a supervisor keeps people clear of the swing radius and falling-object zones. Any entry into a shaft follows a confined-space plan, with gas monitoring and rescue equipment on hand.

We keep drilling and pile driving away from underground utilities until locates and potholing are complete, and we monitor adjacent structures for vibration when driven piles are used near existing buildings. The detailed process for shafts is covered under drilled pier foundations, and structural steel erection depends on the foundations being plumb and on grade. Anchor bolt locations are surveyed twice, once before the pour and once after.

Put the Boring Logs in Front of Us

Send the geotechnical report and the structural loads. We will compare foundation options, price them side by side and identify the groundwater and soil-handling risks.

Common Questions

How do I know whether my site needs deep foundations?

The geotechnical report decides. If borings show weak or variable soils to a depth that spread footings cannot bridge, or if loads are large and settlement tolerances are tight, the engineer will recommend deep foundations. We compare the cost of deep elements against ground improvement and overexcavation so you can see the options, not only one answer.

Does contaminated soil change foundation costs?

Yes. Drilled spoils from impacted ground may need testing, segregation and disposal at a permitted facility, and groundwater from dewatering may need treatment before discharge. On parcels near historic industrial or smelter areas, we recommend environmental review before deep foundation design is final so the budget carries a realistic allowance.

Can piles or piers be installed inside an existing building?

Often. Low-headroom drilling rigs, helical piles and micropiles can install foundations inside an operating plant with limited vibration and dust. The access, clearance and floor cutting must be planned, and we coordinate shutdown windows, dust control and temporary protection for production areas.

How long does foundation work take?

Duration depends on the number of elements, their depth and the rigs working. A moderate building can have its piers or piles in within a few weeks, while a large program may run months. We provide a production-based schedule with weather float and tell you what the rig count would do to the end date.

What inspections are required?

Deep foundations typically require a special inspector, often provided by the geotechnical firm, who verifies depth, bearing, reinforcement and concrete placement for each element. We schedule inspectors ahead of drilling, record each element and submit logs promptly so cap forming is never held for paperwork.

Related

Ready to talk about your project?

Request a Project Review

Talk to Our Project Team

Industrial Contractors of Denver

Project reviews for Denver, CO and nearby communities

Request a Review

ServicesBuilding TypesIndustriesService AreasAboutContactRequest a Project Review720-679-1387
Call Now720-679-1387